On August 30, Brightway one set slurry separation plant, capacity 250m3/h, has been completed commissioning and started operation in Thailand. The system was customized by Brightway in June this year. The system was successfully delivered to the customer site in early August. The Brightway after-sales team also arrived at the site at the same time.
At present, The country is implementing a number of urban infrastructure projects, One project is the laying of underground sewers in MG City. The total length of the project is about 18 kilometers, and divided into several sections of construction, A pipe jacking machine with an inner diameter of 1.8 meters is installed on site. the well depth is 12 meters. After completion, the project will solve problems of the urban drainage and sewage effectively. In this project, Brightway company design and manufacture the slurry separation plant to macth with the pipe jacking machine.
Due to local weather conditions, the whole project was constructed at night. Brightway after-sales service team, overcome all kinds of discomfort and difficulties, help and guide the workers to hoisting, installation and commissioning the whole system. And provide professional training on equipment operation and maintenance for construction unit technicians. they are very grateful and satisfied with the after-sales support of Brighway. At present, all the system and equipment of the whole project have been commissioning and run successfully.
In the fields of urban construction, subway shield construction, urban tunnel construction, trenchless project, river dredging, Brighway provide professional and customized integrated solutions of mud separation and mud treatment and help build municipal infrastructure at home and abroad.
The Related News: Thailand 1000GPM Slurry Recycling Unit for Underground Pipe Network Construction