News from Greatwall Drilling, the drilling site 50018 is turning waste into wealth by applying Brightway’s Drilling Waste Treatment to recycle the resource.
Walk in the oil drilling site, there is no mud pit and seepage prevention cloth any longer but a row of neat and clean mud tanks, shaking shale shakers, high-speed operating drying shaker as well as tidy bricks. When the drilling machine operates, there is no drilling mud spreading around; all the drilling site is just clean, tidy and in order.
Drilling Waste Treatment of Brightway applied by this company is characterized by its self-independent research and development technology which can overwhelmingly recycle the drilling waste; Fully purifying the drilling waste seems easier to control the index of drilling mud performance, which helps to avoid drill-jamming accident and advance the quality of pole-forming. The processed drilling mud can be recycled, mud making materials saved and costs decreased.
There used to be a giant mud pit which was used to contain drilling mud and rock waste with taking more risk and occupying land source. But there is no need for mud pit after applying the Drilling Waste Treatment, which the mud tank holds drilling mud, drilling fluid and rock waste to recycle.
According to the statistics, by using this system, about 300m3 water can be saved. Recycling the drilling mud not only save the fees for shipping waster, but also save the fees for processing waste water and usage of mud materials.
Solids processed by Brightway’ Drilling Waste Treatment only contains 6% water. Applied at oil drilling site, the drilling waste treatment effectively eliminates the toxic materials in drilling waste and its processing result gets to the required standard.
Rock waste from drilling well will be dried up and divided directly by Drilling Waste Treatment in 50018 drilling site. The processed rock waste is easy to collected and transferred, and it can also be turned into bricks which will be sold to brick industry or for other purpose.
The Drilling Waste Treatment and brick making equipment with high-degree automation just cover a small area. It is operated only by four to five people, and the speed of making bricks can correspond with the processing speed of Drilling Waste Treatment. Note that Brigthway will present this system in Mioge 2015.