Pipe jacking construction working principle: Pipe jacking construction is a construction method of underground pipeline developed after the shield construction. This construction method can not need to strata excavation. and It can cross roads, railways, rivers, ground buildings, underground structures, and all kinds of...
Yesterday, One set 350GPM HDD Mud Recycling System has been sent to Shanghai Port of China and would be transport to India. Brightway HDD recycling system has great reputation in the market. And good comments not come from sales mouth, but come from recommendation between clients. We can have power to say how good it...
Yesterday, Brightway Service Team composed of four persons returned to company from Russia’s Far East Oilfield after completing 15 days of After-Sales Service. They brought one service report about ZJ50LDB Orbital drilling mud solids control system back to Brightway. The customer was very satisfy with the After-Sales...
Yesterday, After strict production and assembly, Brightway one set drilling cuttings waste management was sent to one oilfield of Shandong provice of China. Before this, Brightway invited the customer to visit brightway and inspect the equipment. and the customer was very satisfied. This Drilling Cuttings Waste Management...
Recently, There was good news from the Far East Oilfield of Russia. Beacause of run stable and good mud treatment, Brightway BWLW365G drilling fluids decanter centrifuge, which is matching with ZJ50 LDB Solids Control System, got good reviews in Russia. This BWLW365G drilling fluids decanter centrifuge was designed and...
Yesterday, Brightway shipped one set 500GPM Mud recycling system to Thailand client, which will be matched with customer 220T HDD rig. The mud recycling system is a very compact system with shale shaker and mud cleaner and easy transportation. Customer is satisfied with Brightway’s compact design and production efficiency....
Recently, Brightway one set fracturing fluids management system shipped to one oil drilling company of China after strict production, assembly and commissioning. According to customers’ requirements, This fracturing fluids management system is mainly composed of one set of high-frequency and splash-proof double-deck...
There are a large number of drilling mud and drililng cuttings in the process of oil exploration and production. The traditional approach is that digging a large pool of mud cycle and making treatment of solidification after completion of drilling. The drilling waste is discharged into the mud pools directly. and then...
At the end of the drilling, It can produce a large number of oily sludge. but how to process the oily sludge? According to statistics, Each year there are approximately 1.1 million tons of oily sludge in China’s oil and petrochemical industry. At least 330,000 tons of crude oil is contened in these oily sludge.
In the oil drilling process, The drilling fluids from the well can be transported to the mud control equipment by mud pump. As the first phase equipment of mud control, The drilling fluids shale shaker is one of the mud-water separation equipment and has the characteristics of the earliest separation, the fastest separation,...