Drilling mud generally adopts centralized preparation and dispersion method for preparation of combination.
Usually the drilling company has mud station, according to the geological conditions of drilling mud area prepared to transport to drilling platform, it is easy to centralized management.
Each platform has daily mud pool outside, also have mud storage tank, for drilling process timely supplement. Although the same basic block rock series.
The same, but the location is still a difference, especially in the offshore drilling, to enhance change ability and ability of independent processing accident, it was required that each platform can make mud preparation. Therefore, in the platform with a certain mud ingredients (such as clay, water, oil, diesel oil, mud weighting pill, chemical additives) and mud preparation equipment and apparatus. Mud preparation equipment including: centrifugal pump, mud mixing pump, slurry making tank, recycling mud tank, manifold, ash Tank, mud density automatic control apparatus and pressure fan etc.