Yesterday, After strict production and assembly, Brightway one set drilling cuttings waste management was sent to one oilfield of Shandong provice of China. Before this, Brightway invited the customer to visit brightway and inspect the equipment. and the customer was very satisfied. This Drilling Cuttings Waste Management...
Recently, There was good news from the Far East Oilfield of Russia. Beacause of run stable and good mud treatment, Brightway BWLW365G drilling fluids decanter centrifuge, which is matching with ZJ50 LDB Solids Control System, got good reviews in Russia. This BWLW365G drilling fluids decanter centrifuge was designed and...
Yesterday, Brightway shipped one set 500GPM Mud recycling system to Thailand client, which will be matched with customer 220T HDD rig. The mud recycling system is a very compact system with shale shaker and mud cleaner and easy transportation. Customer is satisfied with Brightway’s compact design and production efficiency....
Recently, Brightway one set fracturing fluids management system shipped to one oil drilling company of China after strict production, assembly and commissioning. According to customers’ requirements, This fracturing fluids management system is mainly composed of one set of high-frequency and splash-proof double-deck...
Recently, After a 45 days production, Brightway one set Oily Sludge Treatment Systems has been sent to a domestic oilfield in three lots. This system is designed and manufactured based on site conditions and repeated experiments of oily sludge treatment. It is composed of Drying Shaker, Vertical Cuttings Dryer,Three-phase...
Brightway one set Drilling Waste Disposal System sent to an oilfield of Xijiang of China. According to customers’ requirements, The system is composed of one unit vertical cuttings dryer and other auxiliary equipment. It will be used to process drilling waste environmentally. This system is produced according to the...
Why we use Mud Recovery System for HDD ? In the project of horizontal directional crossing, The need of large amount of mud increase mud cost and land cost. What is more serious is that if you do not process the mud timely and effectively after horizontal directional drilling, It is easy to cause pollution to
Recently, Brightway BWLS-60 Screw Conveyer has been completed production and testing, and sent to the customer. This Screw Conveyer will be matched with offshore oil drilling platform and transport drilling waste cuttings. It can transport 60 tons per hour. In the field of oil drilling, Screw Conveyer is important auxiliary...
Today, after completion of production, assembly and testing, Brightway new type BWSP180-20 TBM Separation Plant has been completed lifting safely, and will be sent to Middle East. This Separation Plant is designed and manufactured according to customers’ requirment. the capacity is 180m3/h. It is used matching with...
Recently, Brightway new type ZJ50 solid control system customized for a well drilling contractor in Saudi Arabia has been completed production, assembly and testing by a third party inspection and supervision. and will be sent to Shanghai Port. This system includes 8 mud tanks (The effective volume of 320 cubic meters)...